Fuel storage plant in the Basque Country
DBA BILBAO PORT
Open 24 hours
- Connection pipeline to the dock with a 12-inch loading arm for biofuels and fossil fuels.
- Connected by pipeline to other terminals in the area and to the oil tanker dock.
- Three 300 m3/h pumps.
- Maximum draft 18 metres.
- Maximum length: 250 metres.
- Five multi-product loading islands, with a loading system for 3 different additives.
- Vapour Recovery Unit.
- Automated instrumentation and control system.