Fuel storage plant in Galicia
DBA FERROL
This project is currently under development. It is scheduled to open in 2024.
- Pipeline connection to the dock: TBD.
- Maximum draft: 20 metres.
- Maximum length: Any ship.
- Products stored: diesel, petrol, FAME.